HCSV tri-axle LPG tanker semi trailer/storage tank
Standard:
steel pressure vessel GB150-1998
pressure vessel safety technology and inspection procedures
steel pressure vessel welding procedures>JB/T4709-2000
steel chemical container manufacturing technical conditions HG20584-1998
pressure vessel coating and transport packaging JB/T4711-2003
1,Dimensions(length*width*height) 13000*2500*4000(mm)
2,Estimated Tare Weight 14926KG
3,Payload 25074KG
4,Total Weight 40000KG
5,Effective Volume 59.7CBM
Shell Of Tanker
1,Products LPG, Butane , Propane
2,Fluid property flammable
4,Design temperature -40°C to 50°C
5,Design pressure 1.61MPa
6,Corrosion allowance 1.0mm
7,Major materials of bearing pressure Tanker body : Q345R , 12mm
End plate : Q345R , front:10mm,Rear:12.5mm
Main Beam : T700
8,Filling weight per volume 420Kg/m3
9,Maximum filling weight 24486Kg
10,Compartments One
11,Baffle inside the tank14-off Aluminum bolted plate ,thickness is 5mm
12,ShapeCylindrical ; Ellipse head
Detection
1,Heat treatment Overall heat treatment in a furnace , 500°C to 560°C
2,Flaw detection 100% Flaw detection
3,Hydrostatic test 2.1MPa
4,MagnafluxAim at welding place flaw detection can not cover
Manhole (As customer's requirement )
1Quantity1 ; On top
Safety Valve (As customer's requirement )
1,Quantity Two
2,LocationOn the top of tanker ;
3,TypeOnly weld suitable flange
4,SizeAs customer's requirement
Liquid meter (As customer's requirement )
1,Quantity and Model1
2,LocationOn left side of tanker
3,TypeOnly weld suitable flange
4,SizeAs customer's requirement
Valve and pipe Detail (As customer's requirement )
Running System
1,Axles3*13 TON FUWA Axles
2,Suspension system1Leaf spring
3,Wheel rim 12*9.00
4,Tyre 12* Brand : Triangle,12R22.5 vacuum tires
5,Kingpin 1*90#
6,Landing legs1*28Ton FUWA
Pneumatic Brake System
1.Spring brake chamber6FUWA
2.Air connector1FUWA
3.Relay Valve1BRAND:WABCO
4.ABS1WABCO ABS
Electronical System
1,7-Pin Socket124V 7-pin socket
2,LED Lamp1All kinds of lamp
3,Cable 1Stander cable
Accessories
1,Small Tool box1
2,Wheel carrier1
3,Fire extinguisher2With red box
4,Cabinet1
5,Plastic fender6
6,Static conductive belt1
7,Impeller blasting1Completely
8,Paint1As customer requirements
Terms
1,Payment Terms30%TT in advance,the balance should be paid against the copy of B/L.
Or L/C at sight.
2,Shipment TermsIn bulk
3,Production TimeIn 70-80days
4,Shipping TimeIn35-40days
5,Loading PortTianjin Port,China
Contact Person : | Jimmy |
---|